サスペンションスプリング
ワンオフ製作
Optional service
■ One-off rear suspension spring
We will manufacture a high rate spring for YSS rear suspension for CB125T according to your weight.
We can handle up to 80kg, 90kg, 100kg, 110kg and 120kg with the price unchanged.
* It is not made by YSS, but a spring made in Japan that we jointly developed with a Japanese manufacturer.
Spring color: Black or white You can choose
Production cost: 15,000 yen (excluding tax)
Estimated production period: 3 to 4 weeks
Build-to-order manufacturing
Customers who order the YSS rear suspension for CB125T at the same time are free of charge for spring replacement.
Standard springs will be included when the product is delivered.
■ Reinforced front fork spring
A reinforced spring designed to match the YSS rear suspension.
It can also be used as a genuine repair part.
We can manufacture genuine front forks for CB125T (JC06), front forks made in China, and springs for each.
* It is not made by YSS, but a spring made in Japan that we jointly developed with a Japanese manufacturer.
Material: SWOSC-V
Shot peening process
Estimated production period: 3 to 4 weeks
Build-to-order manufacturing
Set of 2 for genuine forks 33,000 yen (excluding tax)
Set of 2 for Chinese forks 35,000 yen (excluding tax)
<Reference data>
CB125T (JC06) genuine spring
Manufacturer service manual
Front fork spring free length new 529mm
Specification limit 518.4mm
Free length of front fork spring 515mm removed from the vehicle that traveled about 30,000km
It exceeded the usage limit set by the manufacturer.
* Genuine fork springs are common from the initial type (JC06-110) to the final type (JC06-160).
Difference between genuine front fork and Chinese front fork
The installation itself on the vehicle is the same as the genuine one, but please think that the contents are different.
There was no compatibility between genuine products and Chinese products, such as springs, spring rates, and parts for each part. Therefore, there is a difference in the production cost of reinforced springs.
Detailed verification results are introduced in this article.
how to order
1. Please fill in the required items on the order form. We will get back to you shortly.
2. Please pay by bank transfer or PayPal (credit card compatible). After confirming payment, we will place an order with the manufacturer based on the order.
Estimated production period: Approximately 3 to 4 weeks
* Excluding Obon during the year-end and New Year holidays
* Cancellations and specification changes cannot be accepted after payment.
3, Please receive the item.
After the item arrives at our company, we will inspect it and ship it by shipping fee.